Bldg. 1430 Upgrade Existing OPS Center
Fort Carson, Colorado
This renovation project at Fort Carson included demolition of existing walls and the reconstruction of interior masonry walls. The scope of work included drywall, paint, raised floor, flooring, electrical, and mechanical upgrades. Mass designed, fabricated, and installed exterior metal stairs. A secure entry area and enhanced security measures in existing walls and windows were a key feature of this contract.
« Back To Projects
|